ASSESS
homeHOMESEARCHSITEMAPLOGIN

Deliverables

Del. No. Deliverable Name short WP No. Lead Part. Delivery date Document
D1.1 Report of Inventory of possible test scenarios (previous projects, previous FOT studies and test scenario technical meeting) WP1 TRL 30/sep/09 ASSESS D1.1-FINAL-Preliminary_Test_Scenarios-PUBLIC-2009.11.19.pdf
D6.5 Flyer publication with general project information for public project dissemination WP6 UNI 30/nov/09 ASSESS-D6.5-project-Flyer publication-December-2009.pdf
D4.1b Report for the update and standardisation of track and laboratory tests - public part WP4 BAST 31/jan/10 ASSESS D4.1b - FINAL - Action plan pre_crash evalution-PUBLIC-2010-03.01.pdf
D3.1 Experimental design for an evaluation of behavioural aspects WP3 DAI 31/mrt/10 ASSESS D3.1-FINAL - Experimental Design-PUBLIC-2010.03.31.pdf
D1.2 Detailed analysis of field data and previous research defining specifications for test scenarios. WP1 BAST 30/jun/10 ASSESS D1.2 - FINAL-Detailed analysis of field data-PUBLIC-2010.12.21.pdf
D6.1 Project dissemination Supervisory Board meetings (1/4) WP6 FTSS 30/jun/10

cancelled

D6.7 Newsletter (1/4) WP6 UNI 30/jun/10

ASSESS Newsletter 02.pdf

D2.1 Integrated methodology framework WP2 BAST 30/jul/10 ASSESS D2.1-FINAL-Integrated methodology framework-PUBLIC-2010.10.14.pdf
D6.8 Project dissemination Supervisory Board meetings (2/4) WP6 FTSS 30/sep/10 The minutes are not open for the public, available on request for a specific group.
D4.2 Draft test and assessment protocol pre-crash evaluation of integrated safety systems WP4 TNO 31/dec/10 ASSESS D4.2 - FINAL - Draft test and assessment protocol_2011-01-31-EXECUTIVE SUMMARY.pdf
D5.1 Description of the impact conditions for the crash performance evaluation of the pre-crash systems and the possible means to evaluate them. WP5 IDIADA 31/dec/10 ASSESS D5.1 - FINAL - Impact conditions for pre-crash performance-PUBLIC-2011.02.08.pdf
D6.9 Project dissemination Mid Term Public Workshop WP6 FTSS 30/jan/11 ASSESS D6.9 -FINAL - Mid term  Workshop report-2010.10.01.pdf
D2.2 1/2 Socio-economic impact of safety systems (setup methodology) WP2 BAST 28/feb/11 not yet available
D3.2 Report on the experimental study results of the evaluation of behavioural aspects WP3 TOYOTA 28/feb/11

ASSESS D3.2a - FINAL - Experimental studies - PUBLIC - 2011.04.11.pdf 
and updated version
ASSESS D3.2 - FINAL - WP3 Experimental studies - PUBLIC - 2011.12.08.pdf

D6.10 Newsletter describing new developments and results from the project (2/4) WP6 UNI 30/jun/11

ASSESS Newsletter 03 Leaflet on WP2.pdf and
ASSESS Newsletter 04.pdf

D6.11 Two technical publications / articles / conference presentation (1 and 2) [M24] (CHALMERS) WP6 CHALMERS 30/jun/11 ASSESS D6.11 - FINAL - Technical_Papers_1of2_2011.12.16.pdf
D4.3 Final proposal, of a test and assessment protocol for the pre-crash assessment of integrated safety systems WP4 IDIADA 31/okt/11 not yet available
D5.2 Draft test and assessment protocol for the evaluation of the influence of the pre-crash systems WP5 IDIADA 31/okt/11 not yet available
D6.12 Project dissemination Supervisory Board meetings (3/4) WP6 FTSS 31/okt/11 ASSESS D6.12 - FINAL - ONLY AGENDA - SB02 meeting BASt-2011.11.11.pdf
D2.3 Report covering a basic appreciation of Liabilities. WP2 BAST 30/nov/11 ASSESS D2.3 - FINAL Liabilities - PUBLIC - 2011.12.07.pdf
D3.3 Draft protocol for the assessment of behavioural aspects WP3 DAI 31/dec/11 not yet available
D2.4 Report proposing a methodological approach to evaluate the legal effects of Integrated Safety Systems WP2 BAST 30/jun/12 not yet available
D5.3 Compilation of the results of the validation of the final test protocol. WP5 IDIADA 30/jun/12 not yet available
D6.13 Newsletter describing new developments and results from the project (3/4) WP6 UNI 30/jun/12 not yet available
D2.2 2/2 Socio-economic impact of safety systems (collecting input) WP2 BAST 31/jul/12 not yet available
D1.4 Report presenting test methodologies and verification activities of the selected integrated safety systems. WP1 CHALMERS 31/aug/12 not yet available
D6.14 Project dissemination Supervisory Board meetings (4/4) WP6 FTSS 31/aug/12 not yet available
D6.15 Project dissemination Final Public Workshop WP6 FTSS 31/aug/12 not yet available
D1.5 Test procedures documented in format consistent with EC regulations. WP1 BAST 31/okt/12 not yet available
D6.16 Newsletter describing new developments and results from the project (4/4) WP6 UNI 31/dec/12 not yet available
D6.17 Two technical publications / articles / conference presentation (3 and 4) WP6 CHALMERS 31/dec/12 not yet available

Facts & Figures

- 15 partners
- € 3,64 Mio funding from FP7 EC
- Total budget € 5,395 Mio
- Duration: 42 months
- Start 1 July 2009




FP7 Framework




News topics